ID'd the stretchers, Reclaimed this project

  • Posted on: 21 August 2015
  • By: Jay Oyster

OK, I'm finally going to try to finish this thing. I almost gave it up as lost last October when, while trying to square up my bench legs, I ended up doing more damage than good with my table saw. The problem, I didn't have most of my tools, jigs and assorted materials located after our move from Roswell house #1. I've spent the last 10 months slowly (s l oooooooo  w l   y) getting my shop and house back in order enough to do some at least moderately skillful woodworking again.

All of the parts needed to complete the workbench laid out on my outfeed tableThe first, critical step now is to identify the rough lumber that will function as the stretchers on this thing. Unfortunately, I don't have thick enough lumber for one piece stretchers, so once again I'm going to need to patch together two pieces for each of the four stretchers. Finding pieces of silver maple from my dwindling stash of lumber from the farm tree was a sketchy proposition. I didn't think I even had enough left. There are more pieces in storage in Ohio, but I have no way to get it back to Georgia easily any time soon. So it was a major victory last night that I did manage to find  enough pieces for the entire undercarriage of the bench. A major victory was that I actually located my folder of bench plans. (I still can't find my folder for the jewelry armoire project, which is why it's still on the back burner right now.) But with the bench plans in hand, I could finally see my original dimension calculations and knew enough to identify rough lumber. 

Nearest the table saw is the long front-piece for the benchtop. This had long been my intended piece in which to carve a message. I was the only fairly clean long-enough, wide-enough piece I had. Beyond that at the far end of the outfeed table you can see my two big and two smaller legs. The larger legs will be on the front of the bench. And then on top of the legs are the four longer pieces that will serve as the front and rear stretchers. The inner parts are only going to be 3 ½" wide, rather than my original plan of 4", because I simply don't have any long pieces that are straight and wide enough.  Near the orange square (Hey, it's cheap, works well, and most importantly, AMERICAN MADE!) and orange ruler (ditto) are the four pieces to make up the left and right stretchers. On the floor behind the outfeed table I have the end cap of the top. The front and tail vice hardware are stored on the lower shelf of the outfeed table.

Benchtop slab standing, leaning up against the wall among all of my remaining long lumber pieces. (sigh) I really need to get some of this wood *out* of my shop.As you can see, my outfeed table is once again, effectively, the only work surface I have. That's the reason I desperately need to finish this bench project. The benchtop is sitting propped up against the far wall. Here, here's a better picture of it. 

So, I have all of the parts, FINALLY, and I can get to work on squaring up the stretchers and cutting the tenons for the legs. After I run the lumber though the planer and jointer, I'm going to attack this with hand tools as much as possible, particularly the joinery. The incident with the table saw and table leg tenons last year has made me very leary of using power tools for any of the fine joinery attempts.

Shit! I just realized that I don't in fact have all of the parts needed. I still need to source the wood for the front vice chop and lower support. Well, I knew that was the case all along, but I had forgotten. I know I don't have anything large enough for that one. I'm going to need to go find those parts eventually. But for right now, the goal is to get the basic bench put together quickly. I can't screw around with this much longer.


ALL of the parts needed to finish my workbench are finally identified, sitting here on my outfeed table